Shane
October 18th, 2021, 09:30 AM
Ok so i have decided to open a power coating and cerakote business, also thinking about anodizing at some point. Probably going to be a few months out before it is up and running. literally building from scratch at the house should be pouring the foundation in about 3 weeks, then i will have to build the building and electrical. With the size of the oven I will be able to handle most jobs from wheels engine parts, trans, diff and bumpers pretty much everything except for frames. For those into shot therapy cerakote will happen with about 6 months afterwards after i have gone through their certification course. Not sure about anodizing as of yet. Just throwing it out their and hopin things go as planned.